The Humanevi newsletter
Once a week: 5 things worth your time.
1 story, 1 idea, 1 discovery, 1 tool, 1 book.
Direct answer: modular construction (parts made in a factory and assembled on site) and 3D printing of buildings (structures made by machines that deposit material in layers) have the potential to reduce timelines and waste. The main barriers are codes and permitting, cost and scale, the supply chain and market acceptance. Advances are fast, so current data should be checked.
A builder produces apartment modules in a factory and transports them to the site. On-site work gets shorter, but the cost of transport and crane, project approval and the minimum order volume weigh on the numbers. In another case, a small house is printed in a few days, but the roof, installations and finishes still require crews. These are illustrative examples.
Also see the articles on sponge cities and on the future of elder care, which deal with how cities and housing need to adapt. Check local codes and technical sources before deciding on any building system.